Macusani Uranium Project, Peru
At Macusani, we are advancing one of the world’s largest and lowest-cost uranium deposits to help meet the need for clean and efficient energy – strategically sourced in the Americas.
The Preliminary Economic Assessment shown has an effective date of January 12, 2016, and is based on the previous Mineral Resource Estimate and a uranium price of US$50/lb U₃O₈. Following the updated Mineral Resource Estimate announced November 2, 2026, an updated PEA incorporating current uranium pricing and development costs is underway.
1.8 Years Payback, Post-Tax
IRR 40.6%, at US$50/lb U3O8
Low CapEx
Low Cost
*Non-IFRS Reporting Measure
Control of All Defined Uranium Resources in Emerging Uranium District
Strong Project Economics
- Large scale: proposed production averaging over ~6 Mlbs U3O8 per year over a 10 year mine life
- PEA mine plan resources: ~70 Mlbs U3O8 at 289 ppm
Growth Potential
- Updated Mineral Resource Estimate completed (November 2026)
- Updated PEA underway, incorporating current uranium pricing and costs
- Expansion and infill drilling, metallurgical piloting and a PFS planned
Near Surface + Leach Kinetics
- Five near surface deposits included in the PEA mine plan
- Hosted in porous volcanic rock → rapid leach and low acid consumption
Path to Production
- Align existing Peruvian Radioactive Export/Transport rules with IAEA for U3O8
American Lithium has acquired Plateau Energy Metals as of May 11, 2021.
Excellent Infrastructure
- Easy transport
- Low cost power
- Labour
- Water
Supply Security (Peru)
- Mining supportive jurisdiction
- Responsible mining practices
Existing Deposits
- Targeted drilling in and around existing defined deposits
- Infill drilling in inferred deposits outside current PEA mine plan
Kihitian Complex
- Tantamaco South East – targets in between Tantmaco and Quebrada Blanca deposits
- Untested post-land consolidation of extensions to mineralized manto horizon
Regional Targeting
- +47 additional targets property wide
- 85% of exploration land package undrilled – untested targets for early follow-up
Processing
- Tank leach option work to be advanced
- Potential for better recoveries & shorter leach cycle
- Mid-90’s in early tests vs. 88% in PEA
- Capex/opex vs. recoveries trade off
Pre-Concentration
- Potential economic improvement with size/screen sorting
- 85% uranium contained in 50% of mass in fine fraction)
- Potential for less material handling, higher processed grades, reduced processing throughput and smaller plant footprint
Scalability
- Phased expansion, smaller initial capex options to be reviewed
- 2 to 6 Mlbs U3O8 annual production ranges considered previously
- Review + engineering work in consideration
In October 2023, American Lithium released an updated Mineral Resource Estimate (“MRE”) that increased the projects Measured & Indicated (“M&I”) Lithium Resources by 476% relative to the previous MRE released in 2019, making Falchani one of the largest hard-rock lithium projects globally.
The Preliminary Economic Assessment shown has an effective date of January 12, 2016, and is based on the previous Mineral Resource Estimate and a uranium price of US$50/lb U₃O₈. Following the updated Mineral Resource Estimate announced November 2, 2026, an updated PEA incorporating current uranium pricing and development costs is underway.
In November 2026, American Lithium released an updated Mineral Resource Estimate (“MRE”), prepared by Deloitte with an effective date of July 1, 2026, that increased the share of the resource classified as Measured & Indicated (“M&I”) to 57.16 Mlbs U₃O₈, positioning Macusani as the largest known, undeveloped uranium project in South America.
Macusani Mineral Resource Estimate
Deloitte, effective July 1, 2026
| Metric Units | Imperial Units | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Complex | Deposit | Mining Method | Resource Category | Tonnes (Mt) | U Grade (ppm) | U3O8 Grade (ppm) | U3O8 Content (000 kg) | Tons (Mt) | U3O8 Grade (lb/ton) | U3O8 Content (Mlb) |
| Measured and Indicated | ||||||||||
| Corachapi | Corachapi | OP | Measured | 10.482 | 151 | 179 | 1,871 | 11.555 | 0.36 | 4.13 |
| Corachapi | OP | Indicated | 5.329 | 132 | 156 | 830 | 5.875 | 0.31 | 1.83 | |
| Colibri | Colibri II & III | OP | Indicated | 32.238 | 184 | 217 | 6,985 | 35.536 | 0.43 | 15.40 |
| Kihitian | Chilcuno Chico | OP | Indicated | 27.366 | 180 | 212 | 5,804 | 30.166 | 0.42 | 12.79 |
| Chilcuno Chico | UG | Indicated | 5.133 | 218 | 257 | 1,318 | 5.658 | 0.51 | 2.91 | |
| Quebrada Blanca | OP | Indicated | 3.529 | 279 | 329 | 1,163 | 3.890 | 0.66 | 2.56 | |
| Quebrada Blanca | UG | Indicated | 0.582 | 189 | 222 | 129 | 0.642 | 0.44 | 0.29 | |
| Tantamaco | OP | Indicated | 21.943 | 166 | 196 | 4,296 | 24.188 | 0.39 | 9.47 | |
| Tantamaco | UG | Indicated | 6.022 | 162 | 191 | 1,152 | 6.638 | 0.38 | 2.54 | |
| Isivilla | Isivilla | OP | Indicated | 4.989 | 300 | 353 | 1,763 | 5.499 | 0.71 | 3.89 |
| Corani | Nueva Corani | OP | Indicated | 4.295 | 122 | 143 | 616 | 4.734 | 0.29 | 1.36 |
| Total Measured and Indicated | 121.908 | 180 | 213 | 25,927 | 134.381 | 0.43 | 57.16 | |||
| Inferred | ||||||||||
| Corachapi | Corachapi | OP | Inferred | 4.258 | 159 | 188 | 799 | 4.694 | 0.38 | 1.76 |
| Colibri | Colibri II & III | OP | Inferred | 11.430 | 146 | 172 | 1,965 | 12.599 | 0.34 | 4.33 |
| Tupurumani | OP | Inferred | 13.464 | 110 | 130 | 1,745 | 14.841 | 0.26 | 3.85 | |
| Kihitian | Chilcuno Chico | OP | Inferred | 24.221 | 283 | 334 | 8,085 | 26.699 | 0.67 | 17.82 |
| Chilcuno Chico | UG | Inferred | 11.846 | 298 | 351 | 4,160 | 13.058 | 0.70 | 9.17 | |
| Quebreda Blanca | OP | Inferred | 11.961 | 261 | 308 | 3,686 | 13.184 | 0.62 | 8.13 | |
| Quebreda Blanca | UG | Inferred | 3.391 | 256 | 302 | 1,022 | 3.738 | 0.60 | 2.25 | |
| Tantamaco | OP | Inferred | 11.137 | 185 | 218 | 2,425 | 12.276 | 0.44 | 5.35 | |
| Tantamaco | UG | Inferred | 2.823 | 198 | 234 | 660 | 3.111 | 0.47 | 1.45 | |
| Tuturumani | OP | Inferred | 1.558 | 132 | 156 | 243 | 1.717 | 0.31 | 0.54 | |
| Tuturumani | OP | Inferred | 0.654 | 154 | 181 | 119 | 0.721 | 0.36 | 0.26 | |
| Isivilla | Isivilla | OP | Inferred | 5.740 | 320 | 378 | 2,168 | 6.327 | 0.76 | 4.78 |
| Puncopata | OP | Inferred | 6.280 | 200 | 236 | 1,483 | 6.923 | 0.47 | 3.27 | |
| Calvario I | OP | Inferred | 2.024 | 232 | 274 | 554 | 2.231 | 0.55 | 1.22 | |
| Corani | Nueva Corani | OP | Inferred | 4.087 | 107 | 126 | 515 | 4.505 | 0.25 | 1.14 |
| Total Inferred | 114.873 | 219 | 258 | 29,629 | 126.626 | 0.52 | 65.32 | |||
- The Mineral Resources are reported on a 100% attributable basis.
- All open pit (OP) Mineral Resources are reported using a ~47 ppm U pit shell and cut-off grade.
- All underground (UG) Mineral Resources are reported using a ~111 ppm U cut-off grade.
- Tonne is metric tonne and ton is short ton. These are calculated based on a density of 1.98 t/m³ for all complexes except Colibri, which is based on a density of 1.99 t/m³.
- Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that any Mineral Resource will be converted into Mineral Reserve.
- Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and content.
- U grade to U3O8 grade conversion factor 1.1793.
- There are currently no known risks that could materially affect potential development.
- The Mineral Resource estimate has been prepared by Stewart Nupen, B.Sc. (Hons), FGSSA, Pr Sci Nat of Deloitte in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) “Estimation of Mineral Resource and Mineral Reserves Best Practices” guidelines and is reported in accordance with the Canadian Securities Administrators NI 43-101. The effective date of the Mineral Resource Estimate is July 1, 2026.
American Lithium Increases Macusani Uranium Measured and Indicated Resource
Project Advancing Towards Updated PEA VANCOUVER, BRITISH COLUMBIA, November 2, 2026 – American Lithium Corp. (“American Lithium” or the “Company”) (TSX-V:LI | OTCQX:AMLIF | Frankfurt:5LA1) is pleased to announce an updated Mineral Resource Estimate (“MRE”) for the Macusani Uranium Project (“Macusani” or the “Project”), located in southeastern Peru. The updated resource estimate, with a larger […]
American Lithium’s Falchani Pilot Plant Fully Commissioned and Operating
VANCOUVER, BRITISH COLUMBIA, September 16, 2026 – American Lithium Corp. (“American Lithium” or the “Company”) (TSX-V:LI | OTCQX:AMLIF | Frankfurt:5LA1) is pleased to report that the Falchani Lithium Project pilot-plant has all systems installed and operating. Recent laboratory testing has demonstrated an improvement in lithium recoveries. The pilot-plant, being advanced by TECMMINE in Lima, Peru, […]
American Lithium Reports Results of Annual General Meeting
VANCOUVER, BRITISH COLUMBIA, August 26, 2026 – American Lithium Corp. (“American Lithium” or the “Company”) (TSX-V:LI | OTCQX:AMLIF | Frankfurt:5LA1) is pleased to report the voting results for the Company’s Annual General Meeting of Shareholders (the “Meeting”) held today in Vancouver, British Columbia. Detailed voting results of the election of the Company’s board of directors […]